Heddes Construction & Development has commissioned Blitta Facade Systems to engineer and install the aluminum curtain wall systems, including façade elements and window frames, for three residential towers:
- Block A – 4,170 m²
- Block B – 950 m²
- Block C – 3,000 m².
Engineering was completed in early 2023, and production and installation are currently in progress.
During the excursion Blitta takes you through their world full of facade construction. They show the full process from the start if the development to the final product. The projects visited during the excursion give you an idea of various products, curtain walls (in combination with wood), element facades and frames. In addition, these projects are in an advanced stage of implementation, giving you a good idea of what happens on a construction site!